Case Studies

Every project is an opportunity to provide safer, stronger and smarter solutions.
Explore how our capabilities come together to support customers in Australia and around the world.

AllCase Studies

Brooklyn to Lara Gas Pipeline

B&R supplied Monarch IP enclosures for the Brooklyn to Lara gas pipeline project, providing secure, durable housing for cathodic power units. Powdercoated in Hawthorne Green and fitted with custom internal components, the enclosures were delivered on time, ensuring reliable protection against corrosion and vandalism.

Cairns Regional Council

B&R supplied 316 stainless steel Universal NI enclosures with vent kits and heavy-duty locks for Cairns Regional Council’s level monitoring stations. Designed to resist corrosion and vandalism, the enclosures were delivered on time and have enabled reliable, secure monitoring of the Council’s water supply.

Dampier Salt North Shore

B&R supplied durable, custom-fitted enclosures for the Dampier Salt North Shore project, supporting conveyors, stacker reclaimers and hoppers in harsh Pilbara conditions. Incorporating safety-focused designs and tailored fit-outs, the enclosures were delivered on time and met all project specifications, ensuring a reliable and safe solution for the end user.

Dry Creek Rail Yard

B&R supplied 27 customised stainless steel enclosures for the Dry Creek Rail Yard, improving heat dissipation and IP rating while meeting project specifications. The successful collaboration with O’Donnell Griffin, Sinclair Knight Merz and TransAdelaide strengthened B&R’s presence in the rail sector and positioned the company for future opportunities.

Fiona Stanley Hospital

B&R Enclosures supplied the rack systems for the Fiona Stanley Hospital ICT network, supporting Middy’s WA and Nilsen WA in meeting strict delivery schedules across this major healthcare project. The solution underpins the hospital’s advanced digital infrastructure designed to deliver integrated, efficient and patient-focused care.

Glendale Pump Station

B&R supplied Monarch IP 316 stainless steel enclosures to support the rapid construction of elevated switchboards for Hunter Water Corporation. The resilient, modular enclosure system enabled completion within 10 days and has since been selected as the preferred enclosure standard for future pump station upgrades.

Gold Coast University Hospital

B&R Enclosures delivered a customised data centre solution for the Gold Coast University Hospital, supplying 70 Ausrack Plus cabinets with tailored airflow, security and cable management enhancements. Staged delivery ensured smooth installation, and ongoing support has helped maintain reliable performance across the hospital’s critical ICT infrastructure.

Midfield Meats

Midfield Meats selected B&R’s iLINQ system to support a staged cooker upgrade, using a single modular tier to provide temporary power with no production downtime. The flexible design enables a planned expansion to six tiers using standard components, delivering a robust and scalable long-term switchboard solution.

Northparkes Mine

JA Martin Electrical selected B&R’s Signature SE modular switchboard system to meet the demanding 1000V specifications for Northparkes Operations. The project was delivered on time and on budget, providing a type-tested, expandable and Australian-made solution for powering drilling and loading equipment.

Ok Tedi Mine Papua New Guinea

For the OK Tedi Mine pipeline, B&R supplied a stainless steel enclosure solution designed for extreme rainfall and humidity. The system provided secure, reliable protection for cathodic power units, incorporating controlled humidity, enhanced locking and weather shielding.

Peninsula ECO Project

B&R supplied custom marine-grade aluminium cabinets for the Peninsula ECO Project, providing secure, durable protection for air valves and carbon canisters. Designed for vandal resistance, ventilation, and aesthetics, the cabinets were delivered on schedule, supporting the transfer of sewage from Rye, Blairgowrie, Sorrento, and Portsea to Boneo STP.