B&R Helps Weston Milling Recover Fast After Flood Damage

Weston Milling, based in Brisbane’s south, required a complete replacement of electrical equipment and enclosures after extensive damage from the January 2011 floods. With operations halted, the project demanded a rapid turnaround to restore the facility to full functionality as quickly as possible.

B&R Enclosures supplied a fully populated TBKS (sloping roof) enclosure, complete with terminations, pushbuttons and wiring tailored to the site’s specific requirements. This ready-to-install solution streamlined installation and ensured compliance with Weston Milling’s operational and safety needs.

Working closely with Stowe Australia, B&R delivered a solution that not only met the urgent timeframe but also enhanced system reliability and provided secure, robust enclosure protection. The upgrade helped the facility recover swiftly while improving long-term performance.

westons-milling-1
westons-milling-3

More posts